POLARIS SITE PREP CREW

Polaris Facility Site Work

Posted

Polaris was a 105 acre mass grading site package that consisted of approximately 550,000 cy of mass grading and associated storm drain,topsoil respread and seeding. The package also included approximately 96,500 sy of base stone on the building pad,laydown area Continue reading

389A1344

County Line Road Interchange

Posted

The new County Line Road interchange project provides access for motorists to and from I-565 to Madison Boulevard and County Line Road. Drivers from Madison and Limestone Counties will have another access point to the interstate. This project began construction in December Continue reading

Sink Hole 4

Sink Hole Repair North of Birmingham

Posted

In March of 2010, a sinkhole developed on Interstate 65, closing both northbound lanes just north of Birmingham, Alabama. This closure forced a 25 mile detour.  Immediately, we were asked to meet with the Highway Director for the Alabama Department Continue reading

Copyright © 2017 Reed Contracting Alabama. All Rights Reserved.

Website by Rocket Town Media